Nord Pool has received the following information:
The total PLC production volume on the day-ahead market for the winter 2020-2021 is 1173 MW containing 562 MW in Sweden and 611 MW in Finland.
The Swedish PLC is available from the 16th of November 2020 – 15th of March 2021 and the Finnish PLC is available from the 1st of December 2020 – 28th of February 2021.
The activation price of PLC production in the power exchange will be the level of price cap of the day-ahead market.
Activation of peak load capacity for power exchange in Finland and Sweden will be based on the activation rules published in Peak Load Capacity (“PLC”) in Sweden and Finland.
For further information, please contact:
Fingrid:
Hanni Sonkeri +358 30 395 52 86, hanni.sonkeri@fingrid.fi
Svenska kraftnät:
Staffan Engström +46 10 475 82 94, staffan.engstrom@svk.se